Naharlagun, Arunachal Pradesh · warehouses Kolkata / Mumbai / Gujarat 9383345207 · sazishubsports@gmail.com
Sazi's Sport HubSports Infrastructure

Hockey turf installation

Water-based and sand-dressed hockey surfaces laid to FIH playing dimensions, with irrigation and drainage planned in.

Hockey is played on the surface, not over it

Hockey is played on the surface, not over it

Hockey demands a low, dense pile so the ball runs true and fast. A football turf will not do the job — the ball snags and the drag-flick dies on the surface.

Water-based turf gives the fastest, truest surface and is what international play uses. Sand-dressed is the practical choice where an irrigation system is not viable.

  • 12–15 mm pile for true, fast ball roll
  • Irrigation planning included for water-based pitches
  • Shock pad mandatory under competition surfaces
  • Asphalt or engineered base for a dead-flat plane
Hockey specification
ItemSpecification
Pitch size91.4 m × 55 m (FIH)
Pile height12–15 mm
SurfaceWater-based / sand-dressed
YarnTexturised polyethylene
Shock padRequired, 10–15 mm
BaseAsphalt or engineered aggregate
IrrigationPerimeter cannon system
StandardFIH Global / National

Get a quote for this

Surface options

Four systems, chosen by site

Which one is right depends on rainfall, hours of play and what is already on the ground.

Water-based turf for hockey surfaces
System 01

Water-based turf

Unfilled, irrigated surface. The fastest and what international hockey uses.

Sand-dressed turf for hockey surfaces
System 02

Sand-dressed turf

Partly filled with sand. Lower running cost, no irrigation needed.

Sand-filled turf for hockey surfaces
System 03

Sand-filled turf

Fully filled. Training and multi-use grounds.

Shock pad system for hockey surfaces
System 04

Shock pad system

In-situ or prefabricated pad beneath the hockey carpet.

Common questions

Hockey FAQ

Water-based or sand-dressed?
Water-based for competition speed. Sand-dressed where irrigation is impractical or running costs matter more.
Can football and hockey share one pitch?
Not well — the pile heights conflict. We advise separate surfaces, or a compromise multi-sport spec that suits neither perfectly.
How much water does a water-based pitch use?
Roughly 20,000–40,000 litres per full watering. Rainwater harvesting and recirculation are worth planning in from the start.
Related surfaces

Other sports we build

All twelve sports

Start a project

Tell us about the ground

Send the sport, the area and the location. We come back with a specification and a number — after a site inspection, not a guess.

  • Free site inspection across the North-East
  • Written specification before you commit
  • One contractor from base to handover